Search
Cranes and structural columns at a construction site
INDUSTRY 04

Construction

Connect survey control and stakeout with site capture, volume checks and as-built records. Integrate positioning and attitude components where the machine requires them.

CORE CAPABILITIES

Built around the work

Site layout, earthwork measurement and spatial records, with sensors and software selected for each task.

TAS Z6 robotic total station product image on a white background

Site Layout

Use TAS Z6 optical measurement or GNSS to transfer design positions to site. Verify control and tolerances before setting out.

AR stakeout guidance screen from the TS30 overview

AR Stakeout

captuRTK™ TS30 provides camera-assisted AR stakeout for supported field tasks. Use surveyed control and check the final point.

Stockpile surfaces colored for volume measurement in MVPStudio

Earthwork Measurement

Use captured surfaces and MVPStudio volume tools to check quantities. Define the reference surface and review measurement assumptions.

T1 attitude and tilt sensor with connection cable, official product image

Machine Component Integration

T1 supplies tilt and attitude data to an integrated system. Positioning, design data, controllers and actuators are separate parts of a machine guidance solution.

Excavator operating on a sloped construction site, from the T1 application material

Tilt and Grade Inputs

T1 measures attitude and inclination. Grade or elevation control additionally requires positioning, a design reference and suitable control hardware.

Building point cloud displayed in MVPStudio

As-built and Progress Records

Capture completed conditions with S1/S2 or survey instruments. Compare checked records at project milestones; a single scan does not establish progress.

TYPICAL WORKFLOW

From requirement to result

A practical sequence that can be adapted to the project, environment and deliverable.

  1. 01

    Prepare design and control

    Confirm project coordinates, design files, control points and required tolerances.

  2. 02

    Set out and measure

    Use TS30 or TAS Z6 for field layout and measurement, with independent checks.

  3. 03

    Capture and calculate

    Use S1/S2 for site capture and appropriate software for surface or volume checks.

  4. 04

    Verify and hand over

    Review alignment and completeness, then prepare the supported as-built outputs.

TALK TO TERSUS

Connect layout, measurement and reality capture on your next project.

Share your environment, accuracy needs and intended deliverable with our team.